RLUS ASTP - Topsides Architecture¶
- 🔗 - \< add link to Todoist project here >
- 📁 - \< add URI/path to project directory here >
Topsides¶
https://docs.google.com/document/d/1CpN3iEBOJCvydVMtZ7G-6EBPbtgeIb_t/edit
5-day GAAP and STAT Ledger close for both Quarterly Financials and monthly trial balances.
**
The 3-day end-to-end actuarial close encompasses the following,
-
Data Lake to Prophet (covered in the FAIR_DL_ARB document)
-
Model run within Prophet (covered in the FAIR_Prophet_ARB document)
-
Topside to Data Lake (covered in this ARB)
-
Prophet to Data Lake (covered in a the FAIR_Prophet to Lake_ARB document)
-
Data Lake to Analytics (covered in a separate ARB to be determined at a later stage)
**
Contents¶
list from "1-Projects/Professional/Client" AND !#Type/Readme AND -"Changelog"
Backlinks
list from [[RLUS ASTP - Topsides Architecture]] AND -"Changelog"